Home     Contact Us    
Main Board Job Seeker's Board Job Wanted Board Resume Bank Company Board Word Help Medquist New MTs Classifieds Offshore Concerns VR/Speech Recognition Tech Help Coding/Medical Billing
Gab Board Politics Comedy Stop Health Issues
ADVERTISEMENT




Serving Over 20,000 US Medical Transcriptionists

Depends on how you count lines

Posted By: mt4ever on 2008-03-17
In Reply to: How long does it usually take line counts to be - posted for Dictaphone/ExText clients? nm

If you count the lines via Extext software, right away. If you use ichart it can take up to 1 hour, it says on the instructions. Depends how your company counts ExText software lines. Hope this helps.




Complete Discussion Below: marks the location of current message within thread

The messages you are viewing are archived/old.
To view latest messages and participate in discussions, select the boards given in left menu


Other related messages found in our database

I've easily done 600, but it depends on the way a company counts lines and it depends on the
dictators. Obviously, if you have a good share of ESL, there is no way you could ever do 600 or 700. On really difficult ones, I usually run around 400 lines an hour and I have been working on this platform for 3 years.
Yup, that is about right - sometimes 700-800 lines per hour, it all depends. nm
x
Too many variables to count. A lot depends on shift, accounts, what types of work you do. (sm)

I can be totally out of work on my 2 accounts and pull up backlog report and see some accounts have OT offered. 


Every company has some employees totally satisfied with amount of work and some who run out totally. 


Like I said, many, many variables to be figured in.


How does one count one's lines on DQS to make sure one's

can DQS be set up to count gross lines? nm
x
If I could count lines, I would know if they were cheating
:+
Do 1 space and count lines and then do 2
It really doesn't affect the line count that much to do the 1 space after punctuation. I agree 100% that they are trying to whittle our wages away wherever, but I don't think this particular issue is a big one. I get virtually the same lines whether 1 space or 2 after sentences. I'm more concerned about the virtual black line that would eliminate ALL spaces like AAMT (or whatever it's called now) is pushing than just a few spaces per report. This is why it's so important for all MTs to know and understand every crazy line-count method out there!
Is it lines = character count/65 maybe?
me
I am not FT hours but FT lines. It depends on the account. sm
I know that my Basic 4 account is number of lines within a certain time frame. It wouldn't hurt to try!
Yes, but do you have an accurate way to count those lines? Has TT fixed
nm
You best not count those chickens (lines) before they hatch. You may end up editing

You may be backing up on saying you can do 2400 in an 8 hour day.


A steady diet of bad dictation I can bet won't afford you 2400 lines in an 8 hour day.


Think twice about Transcend. Overhire and not so great lines count
As far as the hospital job goes, that would be a better,stable choice. I know in our area the clerks obviously make less than the MTs, but it is way above minimum wage, not to mention you get shift/weekend/holiday differential. Find a company is this business that does that. NONE, at least that I have found. Best wishes on your job search.
You know, I never actually counted my lines myself, I just always figured my company's line count
Boy was I wrong!  I just went through and totaled all of my lines, then compared them to the line counter, and guess what!  It's wrong!  Can you guess who I work for?  SOFTSCRIPT!!! 
Puleeze! I heard that monthly for 2 years. I will believe it when I can count lines on it. nm
:+
Medware's IT dept. obviously doesn't work weekends.No lines count for 2 days. nm
not surprised
Is this a live count of lines paid for or same as CTRL I that we do not get paid for ?? nm
m
All compaines count lines different--with spaces, without spaces, headers or no headers, 65 characte
a line, 75 characters, etc. I would ask each of them how they count their lines. Sometimes the way lines are counted does not make a company worth working for.
In my Extext experience count was about 10% less than the Word count. nm
X
It means to double check what THEY say your count it. Count
uj
Are you aware of how they count your time?.. or don't count it i should say
nm
1800 lines is easily achieved. I average 300-340 lines per hour. nm
x
10 lines per minute = 1500 lines for 150 minutes - average. nm
x
I average 1200-1400 lines per day with a national, and am only getting around 600-800 lines per day.
It's been this way since the day before Thanksgiving. I've been doing this for almost 30 years now, and more often than from Thanksgiving until the new year is the slowest time of the year. I have some months where I am swamped with up to 2000 lines per day. I stash that little extra money, and take advantage of a handful of extremely slow days this time of the year to actually cook dinner, decorate for Christmas, or do Christmas shopping. I actually anticipate this slow time every year and have grown to enjoy the breathing time. Any time I have attempted to pick up extra work with another company to supplement these slow times, the minute I get adjusted to the new accounts, etc. I have no time to finish all of my work because my full time job with national gets slammed again. Hang in there if you can, and hopefully your work will pick up significantly around New Years.
They work with you to make sure you get the lines required or the amount of lines you want...
I have never had a problem getting more work
Minimum lines for FT used to be 60,000 keystrokes a day, about 925 lines. Pay was good. Just not a
s
Yes it is possible to double your lines. I cant type 460 lines an hour but I can get those with VR
x
WMX - line count. Was working along and noted line count accumulation (sm)

signed off the report I was typing.  Those lines didn't add immediately, but sometimes they do that.  What concerns me is that when I signed that job off and the next one came up, not only were the other lines not added in but they were LESS than they were before I signed off previous job.


I thought I noticed this happening the other day, but figured I just wasn't paying attention.  Today I definitely noticed it.  For some reason it changed it's mind and took 8 lines off my line count.  What the heck? 


Am not really ecstatic with the way things are going anyway  and then this confuses me. 


Please, someone have a realistic explanation so I don't feel paranoid and cheated here. 


Regular lines, not weighted lines
was what I got paid for....
12K lines payperiod is 6K lines a week.
nm
0.8 x 1000 lines = $80.00 - 0.8 x 1500 lines = $120.

Then company should set line count per day with incentives for above that. If get line count done
:[
It's not 1600 lines -- it's 16,000 lines...and
I've got my contract right here and have already gotten 2 checks and YES, I am getting 9.5 cpl base rate.

I don't know what other people are getting. Don't really care. I work for MY paycheck. Gosh.
Why would they "fix" lines? The more lines you
transcribe, the more you make, the more you make, the more you make. It wouldn't profit any company to put a lid on line counts.
Well, it depends on what you need and are looking for - sm
do you want employee status, need benefits, need equipment supplied by company or do you want IC status, your own schedule, no benefits, and a good line rate?

There are many good companies out there, and even Transcend is a good company in some MTs eyes.

What are you looking for?
4.65 to 5.10 cpl. Depends on whether you
get 55% or 60% of your base salary.  You will starve to death only doing 1100 lines a day.  That would be $51.15 to $56.10 a day,.  
Depends.
I've talked with MTs who have said that MQ dumped them immediately upon giving notice, and they're anxious about getting on somewhere else immediately. I've talked to others who have had MQ offer them the moon and all nearby planets, with interest, to stay. I'm not talking 2 or 3 people here, but dozens. I'm not sure what the motivating factor is behind their decisions, because some of the best MTs I've seen have been ousted immediately. Go figure. Might depend on your office and the work load.
Depends
one person will tell you one thing, the next person will tell you another.  I think the company I work for is THE best but then you might not agree.  You kinda just have to find what works for YOU and you won't really know that until you try it.
Depends on what day it is.
I use a lot of "normals" and shortcuts.  I make at least $20 per hour, that is on a regular day.  I have made as much as $65 an hour.  I get $15 an hour for PTO. 
Well, depends
My requirement used to be 4000 lines (Foxboro office). Now I am at Columbus office and requirement is 4000+ lines, but also must work 20 hours a week, so that would put me at over 10000 lines a payperiod.
also depends
it also depends on the accounts, most of the accounts for one small MTSO do not have paragraphs, straight typing thru the complete report.
I'm sure that depends on what one...
has to offer, as it does with most companies.  :)
Depends..
on if you have write offs or not.  I was an IC for years and then went outside the home to work.  When coming back to home base, I found it not to be an advantage anymore because I had no write offs and didn't want to open up Pandora's box with itemizing again.
It just depends..
It depends on what state you are in and how many employees are working in that state to determine if you are eligible for health benefits.  With my state, there are only about 2 employees that work for FutureNet, so I am not eligible for health benefits.  As for incentives, they have great incentives.  You get 15% bonus every weekend, and 17% and 20% holiday bonuses.  So they are fair with what they offer.  Their pay is good; better than other places that I know of.  And, again, they are really great to work for.  You may be in a state that has several employees with them.  I would just ask them.  They are quick to tell you what you need to know.  Hope this helps.
I think it depends.....
If you have a wide-open screen, like MS Word, or WordPerfect, that allows you to set formats, change fonts, etc. I think it will work. It is my understanding that I-chart is a series of different boxes on the screen in different locations, so you are very significantly limited in your text inputting. But then again, IT works with Meditech, should be able to work with I-Chart, shouldn't it?
Depends
Where did she go to school? I know a lot of companies that will hire newbies if they went to one of the big 3 schools.
Depends
I worked for them and they are great to work for but very picky. They would not pay for jobs under 98%. I would be interested to know what they are paying these days too.
Well, that depends on
your level of experience. If you are comfortable with your terminology it will obviously go faster. It is really hard to answer the question of how much time because each company might use a different amount of files and/or the files are of varied lengths. If I was testing, I wouldn't want to waste more than an hour myself, but that is just my opinion.
Depends

If you are unit based (lines) it is 120 days. If hourly, 90 days.  Costs $90 Medical, 12.50 Dental, 3.85 for vision every pay period. I've had only office visits and have had no problems with it so far.


Depends
for QA or mt?
I believe they pay per line for mt
It depends...

I currently work for Precyse. So far it's been OK. I don't find them to be very flexible about the schedules. And now I'm a bit concerned reading another post here about being denied a schedule change. I'll be needing one in a few months. I'm expecting baby #3 and will need to go part time (also will need a few weeks to recover from birth). I've e-mailed my supervisor twice regarding this and she answered once asking what part time hours I was looking for. I answered her and nothing, so far. I understand prioritizing work matters, but I need to know what's going on before my water breaks. Fortunately that won't be for another 3 months or so.


I'm beginning to understand why so many people here were frustrated with the lack of communication. I guess I will be looking into part time IC work after my son is born.


I think it depends on how they have it set up...sm
I think it depends on how the system is set up.  I have worked on several different systems and they determine the pitch and the margins they want for their reports.